Kick ass on the exams TSOthe-short-one said:I'm in Tucson this week for some classes. Taking a dual engineering (residential/commerical) test with the state on Thursday. I spent 7 hours studying the law exam today. Now, I'm off to Gold's Gym for a good, long workout...
the-short-one said:Here's a sample question:
You have a trench that is 3500 ft long, 9 feet deep, and 3 ft 6 inches across the bottom The ditch slopes at a 1:1 ratio and the top four feet of the trench is 4 feet wide. You are using an excavator with a 3/4 yard capacity bucket. The soil swell rate is 25%. The excavator can remove 27.5 yards of dirt per hour. How many hours will it take to excavate the trench?
Hint. We're dealing in cubic yards and cubic feet.
ok, i CAN'T LET THAT GO. i'M GONNA TRY TO FIGURE IT OUT. Friggin caps lock! OK, I'll try to get back to you next month.the-short-one said:10/25/06
Supps:
1.5iu GH
1 Lipodrine
NO-EXPLODE before Workout
PureCEE before workout
Grean Tea Extract
Yohimbine HCL
Calcium
Multi
Guggelesterones
YES on my tummy, bum and face
oi. Everything hurts today. lolol. delts, bis, tris, hammys. I'm going to the gym today, but I don't know what I'm going to do yet. Proly whatever hurts the least...
Meal #1 (bad)
2 slices Trader Joes Cinnamon Bread
Meal #2 (bad, bad)
venti non-fat latte w/sugar free hazelnut syrup
Meal #3
1/2 meso tech oatmeal chocolate chip bar
I'm studying for a KA contractor's license - dual engineering. I take the test tomorrow and I think I'n nervous eating. lolol The good news is that I took the practice test and scored a 98 out of 100. All I need is a 70 to pass, so it looks like I may be okey dokey. I have a business law tes tomorrow also - that one is a breeze. 80 questions, also with a 70% pass rate. So, if I pass my tests, I have a license to build sky scrapers and bridges and stuff.
I was a little nervous about the math part, but I've got it hammered down. Some trig, some geometry, some calculus. (did I even spell calculus right?) Here's a sample question:
You have a trench that is 3500 ft long, 9 feet deep, and 3 ft 6 inches across the bottom The ditch slopes at a 1:1 ratio and the top four feet of the trench is 4 feet wide. You are using an excavator with a 3/4 yard capacity bucket. The soil swell rate is 25%. The excavator can remove 27.5 yards of dirt per hour. How many hours will it take to excavate the trench?
Hint. We're dealing in cubic yards and cubic feet.
HiDnGoD said:OK, got it. It'll take me 45 seconds to cut a check to have you do it.